RBC Estimation / Quantity Takeoffs

Turn construction plans into bid-ready quantities.

RBC measures the work shown across drawings and specifications, organizes every item into a usable quantity schedule, and reconciles it to marked plans before release.

Scope locked

Trade boundaries, revisions and addenda confirmed.

Plans measured

Counts, lengths, areas, volumes and assemblies traced.

Coverage checked

Omissions, duplicates, scale and units independently reviewed.

Files reconciled

Spreadsheet, BOQ and marked plans agree.

Typical delivery: 24–48 hours after scope confirmation for many projects; complex or multi-trade work is scheduled to match the actual drawing set.

Start with the right output

A quantity takeoff is the measured scope-not just a material list.

A material takeoff focuses on purchasable material. A quantity takeoff can also quantify work activities, assemblies, equipment or labor-related units so the data can support bidding, cost estimating, procurement and project controls.

COUNT

Units and fixtures

Doors, devices, fittings, equipment, accessories and repeated assemblies.

LENGTH

Linear work

Piping, conduit, framing, curbs, trim, reinforcement and other line-based scope.

AREA

Surface systems

Flooring, roofing, drywall, insulation, painting, waterproofing and finishes.

VOLUME

Three-dimensional work

Concrete, excavation, backfill, aggregate and other cubic quantities.

WEIGHT

Tonnage and mass

Structural steel, reinforcing steel and transport-sensitive material groups.

ASSEMBLY

Buildable systems

Measured work linked to components, waste, locations and client-defined cost codes.

What you receive

The takeoff is organized so your team can act on it.

A useful takeoff should move cleanly into a bid, vendor quote request, procurement plan or cost estimate. RBC structures the file around the decision you need to make.

Excel quantity schedule / BOQ

Item description, quantity, unit, location, drawing reference and trade grouping in our template or yours.

Color-coded marked plans

Measured scope remains visible on the source drawings so coverage can be reviewed instead of guessed.

Assumptions and clarifications

Inclusions, exclusions, drawing conflicts, unresolved scope and measurement rules are documented.

Net, waste and gross quantities

Waste and procurement factors are kept visible and applied only where requested or justified.

Location and phase breakdowns

Quantities can be split by floor, area, building, phase, alternates, bid package or cost code.

Bid-ready handoff

The final workbook and marked drawings are reconciled, named consistently and ready for your next workflow.

Marked Plans

RBC quantity takeoff spreadsheet overview
Quantity schedule overview
Measured items, units and quantities organized for pricing and bid review.
RBC itemized quantity takeoff detail
Itemized takeoff detail
Clear quantity lines ready for vendor pricing, cost coding and handoff.

MARKED PLAN SAMPLE

Color-coded measured plan
Measured scope remains visible on the source drawing.
RBC coordinated takeoff view
Coordinated scope view
Trade-specific annotations show what was counted or measured.
RBC linear scope takeoff trace
Linear scope trace
Visible takeoff paths make coverage easier to verify.
RBC trade quantity takeoff detail
Trade takeoff detail
Measured areas and locations stay linked to drawing context.
RBC quantity takeoff coverage verification
Coverage verification view
Marked plans support omission and duplicate checks before release.

RBC takeoff workflow

Six controls from uploaded plans to issued quantities.

Software speeds up measurement. It does not decide what the scope means. RBC keeps document control, interpretation, measurement and verification as separate checks.

RBC Estimation quantity takeoff workflow infographic
RBC Quantity Takeoff Workflow — scope lock, document control, calibrated measurement, independent verification, file reconciliation and release.

01

Scope and deliverable setup

We confirm the trade, purpose, deadline, file format, alternates, inclusions and exclusions before measurement starts.

Control result: The assignment and output format are unambiguous.

02

Drawing and specification control

The drawing index, revisions, addenda and controlling specifications are logged. Conflicts or missing information become clarification items.

Control result: The team measures from one controlled source set.

03

Scale, units and measurement rules

Scales are calibrated and units are tested before counts, lengths, areas, volumes, weights or assemblies are recorded.

Control result: The measurement basis is proven.

04

Digital quantity takeoff

The estimator measures by trade and location, links quantities to the relevant sheets and records assumptions, waste rules and formula logic.

Control result: Every reported quantity has a source and method.

05

A senior estimator checks omitted or duplicated scope, units, high-value items, openings, alternates, assemblies and corrections.

Control result: Coverage is verified independently.

06

Reconcile and release

The spreadsheet or BOQ is reconciled with the marked plans. Totals, filenames, locations, clarifications and requested formats are checked before issue.

Control result: The delivered files agree with one another.

Built around the decision

One set of quantities can support several construction workflows.

Bid preparation

Build a defensible scope baseline, price the right work and reduce last-minute bid gaps.

Procurement planning

Request supplier quotes, compare packages and plan material orders using gross quantities where appropriate.

Budget validation

Test contractor or subcontractor quantities and understand the scope behind a budget number.

Design development

Track how quantities shift as the drawings develop, provided the revision basis is identified.

Change-order review

Measure revised scope against the prior issue and isolate the quantity impact of the change.

Trade coordination

Organize cross-discipline quantities and surface scope overlaps or gaps before they reach the bid.

Across the full project

Quantity takeoffs for every major CSI division.

RBC can deliver one trade, a selected bid package or a coordinated multi-trade takeoff.

Site + Civil

Earthwork, utilities, paving, landscaping, site concrete and specialties.

Structure + Envelope

Concrete, masonry, metals, wood, roofing, waterproofing and openings.

Interiors + Finishes

Drywall, ceilings, flooring, painting, millwork, specialties and equipment.

Mechanical + Plumbing

HVAC, piping, ductwork, plumbing fixtures, equipment, insulation and controls.

Electrical + Low Voltage

Power, lighting, devices, conduit, feeders, communications, fire alarm and security.

Accuracy controls

The quantity is only as reliable as its source trail.

RBC does not rely on software totals alone. The reviewer needs to see where the number came from, how it was measured and whether the final files agree.

SOURCE

Sheet, detail, specification, addendum and revision are attached to the scope.

CHECK

Scale, unit, formula, openings, waste, coverage and duplicate risk are tested.

RECONCILE

The quantity schedule, marked plans and clarifications must tell the same story.

Before you send the plans

Straight answers about quantity takeoff services.

What files can I send?

PDF plan sets are the most common. You can also share a secure cloud link, specifications, addenda, narratives, bid forms and your preferred output template.

Do you provide pricing too?

Yes, when the scope is a cost estimate rather than a quantity-only takeoff. We confirm whether you need quantities, labor/material pricing, or a complete estimate before work begins.

Can you use my spreadsheet or cost codes?

Yes. Share the template and required grouping at intake so the takeoff is built for your downstream workflow.

How do revisions work?

We identify the controlling revision, compare the changed scope and agree whether the request is a correction, clarification or additional service.

Request a Quantity Takeoff Quote

Send the plans and deadline. Our estimator will review the scope and reply with a quote.

Ready for measured scope

Upload the drawings. We will confirm the scope, turnaround and deliverable before measuring.

Send the plan set, specifications, addenda, deadline and any preferred spreadsheet. RBC will review the files and return a clear quote.