HVAC Estimating Services / HVAC / CSI Division 23

HVAC Estimating & Takeoff Services

Heating and cooling equipment, ductwork, air devices, piping, insulation, controls, supports, startup, testing, and balancing measured for competitive bids.

24–48 hour turnaround • Editable, traceable deliverables

MEASURED SCOPE

What RBC measures for hvac estimating services.

The estimate follows the documents, separates systems and units, and keeps assumptions visible for review.

Heating + cooling equipment

Boilers, furnaces, heat pumps, chillers, condensers, rooftop units, split systems, and AHUs.

Ductwork + air distribution

Rectangular, round, spiral, fittings, transitions, diffusers, grilles, registers, dampers, and flex.

Piping + insulation

Refrigerant, chilled-water, hot-water, condensate piping, valves, supports, duct insulation, and pipe insulation.

Controls + commissioning

Thermostats, sensors, actuators, controllers, BAS components, startup, testing, adjusting, and balancing.

RBC WORKFLOW

A compact path from drawings to bid-ready files.

Each stage creates a reviewable handoff instead of a loose list of quantities.

01

Read plans and schedules

Review mechanical plans, equipment schedules, duct layouts, piping diagrams, sections, details, specifications, and addenda.

02

Organize the HVAC package

Separate equipment, ductwork, air distribution, piping, insulation, controls, and accessories.

03

Measure and price

Quantify duct by dimensions, pipe by size and length, equipment and air devices by each, then add labor, lifts, rigging, and current quotes.

04

Review the bid

Check coordination, access, testing, commissioning, permits, taxes, overhead, profit, assumptions, and exclusions.

BID-READY OUTPUT

What your team receives.

Outputs can be organized to match your bid form, cost codes, supplier quotes, or internal review process.

Equipment and air-device schedules

Duct, pipe, fitting, insulation, damper, valve, support, and control quantities

Marked mechanical plans and routing assumptions

Labor, rigging, startup, testing, adjusting, balancing, and commissioning

YouTube Short

Video coming soon

Trade plan and estimate samples

Marked HVAC plan takeoff
HVAC estimate sample

Get Your HVAC Estimate Quote

Fill out the form and our estimator will reply within an hour.

HVAC Estimating FAQs

We cover heating and cooling equipment, AHUs, VAVs, fans, ductwork, air devices, refrigerant or hydronic piping, condensate, insulation, and controls.
Yes. Testing, startup, balancing, commissioning allowances, and related labor assumptions can be identified in the estimate.
Yes. We can measure new construction, replacement, tenant improvement, and phased renovation scopes when the drawings define the work.
Typical turnaround is 24–48 hours after the scope and current drawing set are confirmed.

Send the drawings and deadline. RBC will confirm scope, turnaround, and deliverables.