RBC Estimation / CSI Division 07

Building-envelope estimates measured through every edge and transition.

RBC measures roofing, waterproofing, insulation, air barriers, flashing and sealants as complete assemblies—then prices the access, substrate, waste and quality requirements that affect installation.

Assemblies separated

Roof, wall and below-grade systems organized independently.

Geometry measured

Slopes, openings, vertical and horizontal surfaces handled correctly.

Continuity traced

Edges, transitions, penetrations and terminations itemized.

Execution priced

Access, preparation, weather, testing and temporary protection included.

Typical delivery: 24–48 hours after scope confirmation for many projects; larger or complex packages are scheduled to match the drawing set.

Measured scope

Envelope quantities extend beyond the main surface area.

Division 07 systems succeed or fail at edges, joints and penetrations. RBC measures the field area and the components needed to keep roofing, waterproofing, insulation and air-control layers continuous.

Roofing systems

TPO, EPDM, PVC, modified bitumen, built-up roofing, shingles and metal roofing.

Waterproofing + dampproofing

Foundations, basements, pits, balconies and decks with primers, protection and drainage layers.

Thermal insulation

Batt, mineral wool, polyiso, EPS, XPS and spray foam by thickness, R-value and location.

Air + vapor control

Air barriers, weather barriers, vapor retarders, transitions and opening interfaces.

Flashing + edge metal

Coping, roof edges, curbs, drains, scuppers, boots, termination bars and related accessories.

Sealants + rated protection

Joint sealants, backer rods, primers, firestopping, fireproofing and EIFS scope where specified.

Envelope continuity

Surface → transition → penetration → assembly → release

The workflow starts with assembly location and geometry, then follows every boundary condition so area takeoffs, linear accessories, penetrations and product build-ups remain connected.

01

SURFACE

Roof, wall or below-grade field area.

02

TRANSITION

Edges, corners, curbs and terminations.

03

PENETRATION

Openings, drains, joints and trade interfaces.

04

ASSEMBLY

Layers, thicknesses, waste and execution costs.

RBC estimating method

See the full control sequence at a glance.

This trade-specific workflow keeps scope interpretation, measurement, pricing and independent review visible instead of reducing the work to a bland checklist.

RBC Thermal and Moisture Protection Estimating Workflow infographic

Editable workflow

Four stages from controlled documents to bid-ready files.

The infographic summarizes the controls; these native Elementor cards explain how the estimate is actually built and can be edited later.

01

Control assemblies and performance criteria

Roof plans, wall sections, elevations, foundation details, specifications and revisions establish the estimating basis.

02

Measure surfaces and geometry

Slopes, walls, below-grade areas, openings, horizontal and vertical applications are quantified separately.

03

Build layers, accessories and execution costs

Membranes, insulation, boards, flashing, sealants, fasteners, overlaps, waste, preparation, access and testing are priced.

04

Review interfaces and release

Penetrations, trade responsibilities, supplier pricing, marked plans, assumptions and exclusions are reconciled.

Bid-ready deliverables

Files your team can review, price and issue.

The output is organized for contractor bidding, subcontractor pricing, supplier quote comparison or internal cost review.

Area takeoffs

Roofing, insulation, waterproofing and barrier quantities by assembly and location.

Linear accessories

Flashing, coping, edges, terminations, sealants and expansion-joint measurements.

Assembly schedules

Membrane, insulation thickness, cover board, vapor-control and accessory build-ups.

Marked plans

Measured fields, transitions and penetration locations retained for coverage review.

Material + labor costs

Supplier pricing, waste, access, equipment, preparation, testing and temporary protection.

Assumptions + exclusions

Substrate condition, system interfaces, alternates and unresolved design information.

Quality boundary

Estimating measures the issued envelope design; it does not replace assembly design.

RBC prices the specified systems and documents gaps, assumptions or allowances. Product selection, hygrothermal performance, code compliance and final continuity details remain controlled by the project design and responsible manufacturers or professionals.

SOURCE

Controlled drawing, detail, specification, addendum or quote.

CHECK

Scope method, unit, coverage, interface and reviewer are visible.

RELEASE

BOQ, marked plans, pricing and assumptions agree before issue.

Before you send the plans

Straight answers about csi division 07 estimating.

Do you measure roof slope and penetrations?

Yes. Quantities use the actual roof geometry where available, with curbs, drains, penetrations, edges and transitions measured separately.

How are overlaps and waste handled?

They are applied according to product, layout and manufacturer requirements rather than one universal percentage.

Do you separate waterproofing applications?

Yes. Horizontal, vertical, below-grade and exposed applications are kept separate when their materials or installation differ.

What should I send?

Roof plans, elevations, wall and foundation sections, details, Division 07 specifications, addenda, schedules and deadline.

Request a CSI Division 07 Estimate

Send the plans and deadline. Our estimator will review the scope and reply with a quote.<\/p>

Ready for a controlled estimate

Upload the plans. RBC will confirm the scope, turnaround and deliverables before estimating.

Send the drawing set, specifications, addenda, bid form and deadline. Our estimator will review the files and return a clear quote.