RBC Estimation / CSI Division 10

Division 10 estimates that catch small items before bid day.

RBC reconciles plans, room schedules, elevations and specifications so partitions, accessories, signage, protection and mounting components are counted once and priced completely.

Schedules reconciled

Plans, elevations, details and room schedules checked together.

Mixed units handled

Each, linear-foot, area and assembly quantities kept separate.

Accessories included

Hardware, anchors, tracks, backing and trim reviewed.

Rooms verified

Every scheduled item is tied to a location before release.

Typical delivery: 24–48 hours after scope confirmation for many projects; larger or complex packages are scheduled to match the drawing set.

Measured scope

Specialties are measured by product, configuration and location—not one blanket allowance.

Division 10 products are distributed across rooms, elevations and schedules. RBC separates each size, finish, configuration and installation condition so small omissions do not accumulate into a large bid gap.

Toilet partitions

Compartments, doors, panels, pilasters, screens, hardware and specified material.

Restroom accessories

Grab bars, dispensers, mirrors, hooks and mounting requirements by room.

Lockers + storage

Size, tier configuration, finish, accessories, bases and assembly requirements.

Signage

Room identification, directional, code-required and custom signs by type and mounting.

Wall protection

Wall guards, corner guards, door protection, lengths, heights and terminations.

Display + operable systems

Visual display boards, shelving, folding partitions, tracks and operating hardware.

Room-by-room control

Schedule → room → accessories → mounting → release

The estimate follows each scheduled specialty into the room where it is installed, then checks configuration, accessories, supporting work and supplier pricing before the final quantity is released.

01

SCHEDULE

Type, size, finish and specified unit.

02

LOCATION

Room, elevation and plan reference.

03

COMPLETE PACKAGE

Hardware, backing, mounting and trim.

04

RELEASE

Counts, labor and pricing reconciled.

RBC estimating method

See the full control sequence at a glance.

This trade-specific workflow keeps scope interpretation, measurement, pricing and independent review visible instead of reducing the work to a bland checklist.

RBC Specialties Estimating Workflow infographic

Editable workflow

Four stages from controlled documents to bid-ready files.

The infographic summarizes the controls; these native Elementor cards explain how the estimate is actually built and can be edited later.

01

Reconcile every document source

Architectural plans, elevations, room schedules, details, specifications and addenda are reviewed together.

02

Build category and location schedules

Partitions, accessories, lockers, signage, wall protection and specialty systems are organized by type and room.

03

Measure and price the complete package

Each, length, area and assembly quantities are combined with materials, finishes, hardware, freight, labor and lead times.

04

Review room by room and release

Schedules, marked plans, revisions, supplier quotes, assumptions and exclusions are independently reconciled.

Bid-ready deliverables

Files your team can review, price and issue.

The output is organized for contractor bidding, subcontractor pricing, supplier quote comparison or internal cost review.

Division 10 BOQ

Itemized products, quantities, units, finishes, locations and specification references.

Room schedules

Restroom, locker, signage and specialty items organized by installation location.

Marked plans

Counted items and measured wall-protection scope shown on the source drawings.

Material + labor costs

Supplier pricing, freight, assembly, installation and project-specific allowances.

Accessory checklist

Hardware, anchors, tracks, backing, blocking, trim and support responsibilities.

Assumptions + exclusions

Alternates, trade interfaces, unresolved dimensions and scope clarifications.

Quality boundary

Backing, blocking, power and related trade work must be assigned explicitly.

Some specialty products depend on carpentry, metals, electrical, plumbing or fire-protection work. RBC records whether those supports and connections belong in Division 10 or another package, so the same work is not missed or counted twice.

SOURCE

Controlled drawing, detail, specification, addendum or quote.

CHECK

Scope method, unit, coverage, interface and reviewer are visible.

RELEASE

BOQ, marked plans, pricing and assumptions agree before issue.

Before you send the plans

Straight answers about csi division 10 estimating.

Why are room schedules important?

They identify product types, finishes and locations that may not appear clearly on the main floor plans.

Are mounting hardware and backing included?

We include specified hardware and identify backing or blocking responsibilities based on the contract documents.

How is wall protection measured?

Wall guards are typically measured by length and corner guards by each, with openings and excluded sections treated according to the details.

What should I send?

Architectural plans, enlarged restroom layouts, elevations, room and signage schedules, Division 10 specifications, addenda and deadline.

Request a CSI Division 10 Estimate

Send the plans and deadline. Our estimator will review the scope and reply with a quote.<\/p>

Ready for a controlled estimate

Upload the plans. RBC will confirm the scope, turnaround and deliverables before estimating.

Send the drawing set, specifications, addenda, bid form and deadline. Our estimator will review the files and return a clear quote.