Wood, Plastics & Composites Estimating Services

Detailed Division 06 quantity takeoffs and cost estimates for framing lumber, sheathing, engineered wood, timber, architectural woodwork, cabinetry, decking, cladding, PVC trim, composite railings, and related accessories.

We help contractors convert measured quantities into realistic purchasing quantities using stock lengths, sheet sizes, product profiles, fastening systems, waste, delivery, and installation requirements.

24–48 hour turnaround • Editable estimates • Marked-up drawings • Traceable quantities

What We Quantify

A complete Division 06 estimate covers more than area or linear footage. Species, grade, treatment, stock length, sheet size, profile, layout, fastening, accessories, packaging, waste, and manufacturer requirements affect cost.

Framing Lumber & Timber

Studs, plates, joists, rafters, blocking, beams, posts, heavy timber, treated lumber, stock lengths, grades, and connectors.

Sheathing & Engineered Wood

Plywood, OSB, subflooring, wall and roof sheathing, LVL, I-joists, glulam, rim board, panels, clips, and fastening.

Decking, Cladding & Railings

Wood and composite decking, exterior cladding, fascia, picture-frame borders, stairs, posts, rails, balusters, clips, and brackets.

Millwork, Trim & Plastics

Cabinetry, architectural woodwork, doors, trim, mouldings, panels, PVC boards, composite trim, adhesives, sealants, and hardware.

Main Division 06 Materials We Estimate

Dimensional & Engineered Lumber

Framing, timber, LVL, glulam, I-joists, rim boards, blocking, species, grades, treatment, lengths, and connectors.

Panels & Sheathing

Plywood, OSB, subflooring, wall and roof sheathing, panel dimensions, openings, layout, clips, fasteners, and coverage.

Architectural Woodwork & Trim

Cabinetry, casework, millwork, mouldings, doors, decorative panels, veneer, finish carpentry, and hardware.

Plastics & Composites

Composite decking and cladding, PVC trim, cellular boards, railings, manufacturer systems, clips, profiles, and accessories.

Wood, Plastics and Composites Estimating Visuals

Division 06 wood plastics and composites estimating infographic by RBC Estimation
Wood plastics and composites quantity takeoff example prepared by RBC Estimation

What You Receive

  • Lumber, timber and engineered-wood quantities
  • Panel, plywood, OSB and sheathing requirements
  • Decking, cladding, trim and railing quantities
  • Cabinetry, millwork, hardware and accessory counts
  • Stock-length, sheet-size and purchasing schedules
  • Material and labour pricing
  • Waste and cutting allowances by assembly
  • Fasteners, clips, connectors, adhesives and sealants
  • Delivery, handling, equipment, assumptions and exclusions
  • Marked-up drawings and an editable bid-ready estimate

Our Division 06 Estimating Process

DRAWINGS → QUANTITIES → PURCHASING → PRICING → HANDOFF

Every stage is checked against the plans, specifications, product requirements, and latest revisions.

01 / 06

Scope Audit

Review plans, elevations, sections, schedules, details, specifications, product data, and revisions.

02 / 06

Trade Sorting

Separate framing, engineered wood, sheathing, decking, cladding, millwork, trim, plastics, and accessories.

03 / 06

Quantity Mapping

Measure lengths, areas, sheets, boards, and components with clear drawing references and purchasing units.

04 / 06

Purchase Conversion

Convert measured scope into stock lengths, sheet sizes, packages, profiles, and manufacturer-system requirements.

05 / 06

Cost Build

Add waste, clips, fasteners, connectors, adhesives, freight, equipment, labour, and installation conditions.

06 / 06

Bid-Ready Handoff

Deliver marked-up drawings and an editable estimate with quantities, assumptions, exclusions, and pricing.

What Affects Wood, Plastics & Composites Cost?

Species, Grade & Product

Wood species, grade, treatment, engineered product, composite brand, profile, finish, colour, and performance requirements affect price.

Dimensions & Stock Lengths

Board size, sheet thickness, available lengths, package quantities, cut planning, splices, and order minimums affect purchasing.

Layout & Waste

Board direction, diagonal layouts, borders, curves, openings, pattern matching, sheet optimization, offcuts, and breakage change waste.

Fastening & Accessories

Clips, screws, connectors, brackets, posts, caps, fascia, adhesives, sealants, flashing, and manufacturer systems add scope.

Labour & Installation

Crew productivity, cutting, drilling, finish quality, spacing, expansion clearances, working height, access, and design complexity affect labour.

Delivery & Availability

Long boards, bulky sheets, specialized profiles, freight, unloading, storage, regional supply, lead times, and quotation validity influence cost.

Have a Division 06 Project to Price?

Upload the plans, elevations, sections, schedules, details, and specifications. We will review the wood, plastics, and composites scope and confirm the quote and turnaround before starting.

Common Division 06 Estimating Mistakes

Reliable Division 06 estimates depend on correct product dimensions, stock lengths, layouts, manufacturer requirements, accessories, waste, delivery, labour, and current pricing.

Stock lengths, effective board width, gaps, direction, borders, stairs, splices, and cutting patterns determine the real purchase quantity.

Composite and PVC systems may require specific clips, fasteners, spacing, expansion clearances, profiles, and installation methods.

Screws, clips, hangers, brackets, posts, caps, fascia, flashing, adhesives, sealants, and framing hardware must be included.

Waste should reflect material size, stock lengths, sheet layout, board direction, pattern, curves, openings, and packaging.

Long boards, bulky sheets, custom millwork, specialized products, handling, and site access can materially affect cost.

Supplier availability, lead times, quotations, product substitutions, and the latest drawings should be checked before bidding.

Frequently Asked Questions

Division 06 commonly includes wood framing, heavy timber, sheathing, engineered wood, architectural woodwork, plastics, composites, decking, trim, and related accessories.
Materials may be measured by linear feet, board feet, square feet, sheets, boards, packages, or individual components depending on the product.
Measured quantities come from the drawings; purchasing quantities account for stock lengths, sheet sizes, packaging, layouts, waste, and supplier availability.
The estimate should consider deck area, effective board coverage, board direction, gaps, stock lengths, borders, fascia, stairs, clips, fasteners, and waste.
Species, grade, treatment, product profile, dimensions, layout, accessories, labour, freight, availability, and installation requirements influence total cost.
Specified fastening, spacing, ventilation, expansion, clearances, clips, and approved accessories affect both quantity and labour.
A detailed takeoff converts drawings into realistic purchase quantities and helps contractors control waste, compare quotations, and prepare reliable bids.

Wood, Plastics & Composites Takeoff Video

Request a Division 06 Estimate

Send the plans and deadline. Our estimator will review the scope and reply with a quote.

Send Us Your Division 06 Drawings

Get a scope review and quote for your next wood, plastics, composites, millwork, decking, or framing takeoff.