Equipment estimates that separate supply, installation and connections.
RBC turns equipment schedules, specifications and multidisciplinary drawings into a traceable installed-cost estimate with responsibilities, accessories, freight and startup kept visible.
Tags reconciled
Every scheduled tag is checked against plans and specifications.
Responsibility assigned
Owner, vendor and contractor furnish-install boundaries are recorded.
Installed cost built
Supply, freight, rigging, mounting, labor and startup are separated.
Lead times visible
Quote validity, availability and procurement risk remain reviewable.
Typical delivery: 24–48 hours after scope confirmation for many projects; larger or complex packages are scheduled to match the drawing set.