Mechanical Estimating Services / CSI Division 23 / 22

Mechanical Estimating & Takeoff Services

HVAC equipment, ductwork, piping, plumbing, insulation, controls, supports, testing, and installation requirements coordinated into one mechanical estimate.

24–48 hour turnaround • Editable, traceable deliverables

MEASURED SCOPE

What RBC measures for mechanical estimating services.

The estimate follows the documents, separates systems and units, and keeps assumptions visible for review.

Equipment + air systems

AHUs, chillers, boilers, heat pumps, rooftop units, fans, pumps, tanks, and specialty equipment.

Ductwork + air devices

Supply, return, exhaust, fittings, dampers, diffusers, grilles, and flexible connections.

Piping + plumbing

Heating and cooling water, refrigerant, domestic water, drainage, sanitary piping, valves, and fittings.

Insulation + controls

Duct and pipe insulation, acoustic lining, sensors, thermostats, control panels, and BMS interfaces.

RBC WORKFLOW

A compact path from drawings to bid-ready files.

Each stage creates a reviewable handoff instead of a loose list of quantities.

01

Review the design basis

Read plans, risers, equipment schedules, details, specifications, capacities, materials, and installation notes.

02

Divide the systems

Separate equipment, ductwork, piping, plumbing, insulation, controls, supports, and accessories.

03

Measure complete assemblies

Quantify lengths, sizes, fittings, valves, hangers, insulation, connections, labor, lifting, testing, and commissioning.

04

Coordinate and release

Check architectural, structural, and electrical interfaces, procurement quotes, assumptions, and exclusions.

BID-READY OUTPUT

What your team receives.

Outputs can be organized to match your bid form, cost codes, supplier quotes, or internal review process.

Mechanical BOQ by system, size, and unit

Equipment, duct, pipe, valve, insulation, controls, and support schedules

Marked plans, riser references, and coordination notes

Labor, fabrication, rigging, testing, balancing, and commissioning allowances

YouTube Short

Video coming soon

Trade takeoff sample

Marked mechanical plan takeoff

Get Your Estimate Quote

Fill out the form and our estimator will reply within an hour.

Mechanical Estimating FAQs

We quantify HVAC equipment, ductwork, mechanical piping, plumbing, insulation, controls, pumps, fans, tanks, testing, and related accessories.

Systems are separated and checked against architectural, structural, electrical, schedules, details, and specifications before quantities are released.

Yes. Equipment, accessories, labor, rigging, testing, commissioning, and installation assumptions can be broken into reviewable sections.

Send the current coordinated drawings, specifications, schedules, addenda, and deadline. We flag gaps before measurement.

Send the drawings and deadline. RBC will confirm scope, turnaround, and deliverables.