RBC Estimation / CSI Division 21
Fire suppression estimates grounded in the issued design basis.
RBC measures sprinkler, piping, valves, supports and equipment by documented size, type and location—then reconciles labor, testing, quotes and assumptions before release.
Basis confirmed
Issued drawings, hazard criteria, addenda and exclusions logged.
Pipe by size
Mains, branches and risers measured by diameter and material.
Accessories captured
Fittings, valves, hangers, bracing, sleeves and FDC scope itemized.
Design boundary clear
Takeoff follows the documents and never substitutes for engineering.
Typical delivery: 24–48 hours after scope confirmation for many projects; larger or complex packages are scheduled to match the drawing set.