RBC Estimation / CSI Division 07
Building-envelope estimates measured through every edge and transition.
RBC measures roofing, waterproofing, insulation, air barriers, flashing and sealants as complete assemblies—then prices the access, substrate, waste and quality requirements that affect installation.
Assemblies separated
Roof, wall and below-grade systems organized independently.
Geometry measured
Slopes, openings, vertical and horizontal surfaces handled correctly.
Continuity traced
Edges, transitions, penetrations and terminations itemized.
Execution priced
Access, preparation, weather, testing and temporary protection included.
Typical delivery: 24–48 hours after scope confirmation for many projects; larger or complex packages are scheduled to match the drawing set.