RBC Trade FAQs

Tap any trade to open its questions and answers.

Concrete Estimating FAQs

Footings, foundations, slabs, walls, columns, reinforcement, and formwork.
Yes, alternates and assemblies are listed separately.

Masonry Estimating FAQs

CMU, brick, stone, veneer, mortar, grout, and reinforcement.
Yes, openings, deductions, elevations, and waste are checked.

Plumbing Estimating FAQs

Domestic water, sanitary, storm, gas, fixtures, and equipment connections.
Yes, piping is organized by system and level.

Openings Estimating FAQs

Doors, frames, hardware, windows, storefront, glazing, and louvers.
Yes, schedules are checked against plans and elevations.

Metals Estimating FAQs

Structural metals, stairs, railings, ladders, supports, and miscellaneous metals.
Yes, both can be separated in the estimate.

Finishes Estimating FAQs

Painting, flooring, ceilings, tile, wall protection, and specialty finishes.
Yes, rooms and finish types can be organized by area.

Wood, Plastics & Composites FAQs

Rough carpentry, finish carpentry, millwork, casework, plastics, and composites.
Yes, casework, panels, trim, and hardware are measured.

Communications Estimating FAQs

Structured cabling, data, voice, fiber, pathways, racks, and patch panels.
Yes, testing, certification, and labeling can be shown.

Electronic Safety & Security FAQs

Access control, CCTV, intrusion detection, intercoms, and monitoring.
Yes, devices and systems can be grouped by floor or zone.

Fire Suppression Estimating FAQs

Sprinkler piping, heads, valves, risers, pumps, tanks, and standpipes.
Yes, testing, hangers, seismic bracing, and accessories are identified.

Equipment Estimating FAQs

Construction, kitchen, laundry, medical, material-handling, and specialty equipment.
Yes, owner-furnished and contractor-furnished items are separated.

Specialties Estimating FAQs

Signage, toilet accessories, lockers, partitions, shelving, and scheduled specialties.
Yes, items can be grouped by room, floor, or supplier.

Thermal & Moisture Protection FAQs

Roofing, waterproofing, insulation, air barriers, vapor retarders, and sealants.
Yes, layers, penetrations, edges, and accessories are reviewed.

Drywall Estimating FAQs

Board, framing, insulation, ceilings, soffits, openings, accessories, and waste.
Current drawings, specifications, addenda, and finish schedules.

Electrical Estimating FAQs

Power, wiring, conduits, lighting, devices, low-voltage, and life safety.
Yes, plans, risers, schedules, and specifications are cross-checked.

Mechanical Estimating FAQs

HVAC equipment, ductwork, piping, plumbing, insulation, controls, pumps, and fans.
Yes, equipment, labor, rigging, testing, and commissioning can be broken out.

HVAC Estimating FAQs

Equipment, AHUs, VAVs, fans, ductwork, air devices, piping, insulation, and controls.
Most confirmed HVAC scopes are returned within 24–48 hours.

Services


Get Your FREE Quote