RBC Trade FAQs
Tap any trade to open its questions and answers.
Concrete Estimating FAQs
What concrete work is measured?
Footings, foundations, slabs, walls, columns, reinforcement, and formwork.
Can alternates be separated?
Yes, alternates and assemblies are listed separately.
Masonry Estimating FAQs
What masonry systems are covered?
CMU, brick, stone, veneer, mortar, grout, and reinforcement.
Are openings reviewed?
Yes, openings, deductions, elevations, and waste are checked.
Plumbing Estimating FAQs
What plumbing scope is included?
Domestic water, sanitary, storm, gas, fixtures, and equipment connections.
Can systems be separated?
Yes, piping is organized by system and level.
Openings Estimating FAQs
What openings are measured?
Doors, frames, hardware, windows, storefront, glazing, and louvers.
Are schedules reconciled?
Yes, schedules are checked against plans and elevations.
Metals Estimating FAQs
What metal scopes are covered?
Structural metals, stairs, railings, ladders, supports, and miscellaneous metals.
Are fabrication and erection included?
Yes, both can be separated in the estimate.
Finishes Estimating FAQs
What finishes are included?
Painting, flooring, ceilings, tile, wall protection, and specialty finishes.
Can finishes be measured by room?
Yes, rooms and finish types can be organized by area.
Wood, Plastics & Composites FAQs
What scopes are covered?
Rough carpentry, finish carpentry, millwork, casework, plastics, and composites.
Can custom millwork be quantified?
Yes, casework, panels, trim, and hardware are measured.
Communications Estimating FAQs
What systems are covered?
Structured cabling, data, voice, fiber, pathways, racks, and patch panels.
Are testing and labeling included?
Yes, testing, certification, and labeling can be shown.
Electronic Safety & Security FAQs
What systems are estimated?
Access control, CCTV, intrusion detection, intercoms, and monitoring.
Can device zones be separated?
Yes, devices and systems can be grouped by floor or zone.
Fire Suppression Estimating FAQs
What fire suppression work is covered?
Sprinkler piping, heads, valves, risers, pumps, tanks, and standpipes.
Are testing and bracing reviewed?
Yes, testing, hangers, seismic bracing, and accessories are identified.
Equipment Estimating FAQs
What equipment is covered?
Construction, kitchen, laundry, medical, material-handling, and specialty equipment.
Can owner-furnished items be separated?
Yes, owner-furnished and contractor-furnished items are separated.
Specialties Estimating FAQs
What specialty items are measured?
Signage, toilet accessories, lockers, partitions, shelving, and scheduled specialties.
Can procurement packages be grouped?
Yes, items can be grouped by room, floor, or supplier.
Thermal & Moisture Protection FAQs
What scopes are included?
Roofing, waterproofing, insulation, air barriers, vapor retarders, and sealants.
Are assemblies separated?
Yes, layers, penetrations, edges, and accessories are reviewed.
Drywall Estimating FAQs
What does a drywall takeoff include?
Board, framing, insulation, ceilings, soffits, openings, accessories, and waste.
What files are needed?
Current drawings, specifications, addenda, and finish schedules.
Electrical Estimating FAQs
What electrical systems are covered?
Power, wiring, conduits, lighting, devices, low-voltage, and life safety.
Do you review panel schedules?
Yes, plans, risers, schedules, and specifications are cross-checked.
Mechanical Estimating FAQs
What mechanical scopes are covered?
HVAC equipment, ductwork, piping, plumbing, insulation, controls, pumps, and fans.
Can equipment and installation be separated?
Yes, equipment, labor, rigging, testing, and commissioning can be broken out.
HVAC Estimating FAQs
What HVAC items are measured?
Equipment, AHUs, VAVs, fans, ductwork, air devices, piping, insulation, and controls.
What is the typical turnaround?
Most confirmed HVAC scopes are returned within 24–48 hours.